4. Structural drawings showing the structural components, including footings, bearing walls, beams, and columns that carry the weight of your home from the roof to the ground. In some areas, structural drawings (and, in some cases, all drawings) may have to be sealed and signed by a licensed architect or engineer in order to obtain a building permit. 5. Framing plans showing how floors and roofs are to be framed. Talk to your building permit authority about the documents that you must provide in order to obtain a building permit. If you will need drawings that have been sealed by an architect or engineer, talk to the log home company about whether

Circle 075 on Reader Service Card for Free Information

WHISPER CREEK LOG HOMES

Some companies provide materials for porches and decks; others include porch materials only. Since railings aren’t always required, railing materials (which may be available in several styles) are usually included only as an option.

 

they offer this support and the additional cost. If they don’t offer such services, you’ll need to obtain an estimate from a local engineer or architect. Keep this figure handy for when you compare cost estimates.

Reshaping How W e Live

Deltec Homes offer:

s "REATHTAKING PANORAMIC VIEWS

#ONTACT US FOR A
FREE BROCHURE

s /UTSTANDING ENERGY EFl CIENCY

s (IGH DEGREE OF DESIGN m EXIBILITY

s 2ESISTANCE TO HURRICANE FORCE WINDS

s %CO FRIENDLY DESIGN

EXT
4OLL &REE 5 3 AND #ANADA

WWW DELTECHOMES COM

s 3UPERIOR QUALITY AND STRENGTH

$ELIVERED 7ORLDWIDE

What level of technical support is included in your package? This is especially important if you or a builder unfamiliar with the company’s product will be building your home. Does the company have a detailed construction manual? Do they offer a toll-free number for obtaining on-site support? Do they have technical representatives who visit the site during construction or on an emergency basis?

Next, let’s look at the materials typically included in a log home package. The best way to approach these is by system rather than by component, because different systems require different components. You can be misled when reviewing a materials list and finding something missing from

References:

http://www.mwlsi.com

mailto:mwls@socket.net

http://www.deltechomes.com

Archives